Reports

Reports prepared for this study will be posted on this page once finalized.

  1. In 2008, a Route Planning Study and Environmental Assessment Report was completed which identified the recommended alignment for this section of Highway 69. This report documented the planning process and outlined additional work to be completed during Detail Design to finalize the preferred design and develop mitigation measures. This report is available to download from the Highway 69 Route Planning Study project website.

  2. Design and Construction Report (DCR), CN Rail Re-alignment. August 2014